5/3 Bank Huber Heights, OH

This project was a demolition of an existing building with new construction for the Relocation of a Fifth Third Bank Center. It was built as a LEED Certified Ground-Up Construction.

Project Details

  • Affected SF: 4,500
  • Cost: $2,200,000
  • Duration: 9 Months
  • Floors: 1